【24h】

FUTURE AAD ROLL-OUT PLANS

机译:未来的推出计划

获取原文
获取原文并翻译 | 示例
           

摘要

Bran Sands is the first phase of Northumbrian Water's AAD strategy. A second plant is already planned for Howdon, on Tyneside, subject to the usual regulatory approvals and planning consents.Like Bran Sands, Howdon offers the advantage that it can be built on an existing site while the current treatment process continues to operate.The two plants will also be all but identical when complete, utilizing many of the same design features and operating the same processes. The project therefore offers an unusual opportunity to take the design of the first and effectively drop it on to the second site as a package.
机译:布兰·桑兹(Bran Sands)是诺森比亚水务公司(Northumbrian Water)AAD战略的第一阶段。在获得常规监管批准和规划同意的前提下,已经计划在泰恩赛德州的豪顿市建设第二座工厂。与布兰·桑兹(Bran Sands)一样,霍顿(Howdon)具有可以在现有处理程序继续运行的同时在现有站点上构建的优势。两家工厂完工后,它们将几乎全部相同,它们将利用许多相同的设计特征并运行相同的过程。因此,该项目提供了一个难得的机会来进行第一个设计并将其作为包装有效地放置到第二个站点。

著录项

  • 来源
    《Renewable energy world magazine》 |2009年第2期|64-64|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号