...
首页> 外文期刊>River Research and Applications >RIVER DREDGING, CHANNEL DYNAMICS AND BEDLOAD TRANSPORT IN AN INCISED MEANDERING RIVER (THE RIVER SEMOIS, BELGIUM)
【24h】

RIVER DREDGING, CHANNEL DYNAMICS AND BEDLOAD TRANSPORT IN AN INCISED MEANDERING RIVER (THE RIVER SEMOIS, BELGIUM)

机译:蜿蜒的小河(比利时塞莫瓦河)中的河道疏,、通道动力学和载重运输

获取原文
获取原文并翻译 | 示例
           

摘要

Dredging in the rivers of the Ardenne is generally carried out on a smaller scale to that described in the literature and is not conducted for commercial purposes. Extractions within the river channel are made in order to prevent flooding; hence the quantity of gravel extracted is limited. This study aims to evaluate the impact of dredging and the resilience of the riverbed in the Semois. This river is found in the south of the Ardenne region and is characterized by large incised meanders, a narrow flood-plain, few pebble bars, numerous bedrock outcrops and a limited stock of sediment. The bed is particularly flat and shallow and the bankfull discharge (130m~3s~(-1)) is frequently attained (0.9yr). Pebble tracers allowed the critical parameters (discharge, Shields criterion, and stream power), the diameter of mobilized sediment and the distance of sediment transport to be determined. A major dre.dging campaign resulted in the formation of a channel nearly 1 km long and 2 m deep which functioned as a sediment trap. Topographical cross-sections made before and after the dredging campaign and again 4 yr later allowed bedload discharge to be estimated (1.1 t km~(-1) yr~(-1)). In order to examine the efficiency of the sediment trap, the sediment transport equations of Meyer-Peter and Mueller, Schoklitsch, Bagnold and Martin were applied. With the exception of Bagnold's equation (1980), the observed transport values and those calculated theoretically are relatively close. Between October 1997 and June 2001, 5010t were caught in the sediment trap. For the same period the equations calculate values between 6147 and 105711. The overestimation from the theoretical calculations may result from a lack of sediment supply due to the characteristics of the basin and the frequency and magnitude of flood events during the study period. From the magnitude of the sediment transport rate, a return to the initial state of the riverbed (before dredging) may be expected after approximately 10yr. Despite the scale of the dredging campaign for a river of this size, its results are limited in terms of flood prevention.
机译:通常在Ardenne河流中进行疏to的规模要小于文献中所述的规模,并且不用于商业目的。为了防止洪水,在河道内进行了提取。因此提取的砾石数量有限。这项研究旨在评估疏emo和Semois河床弹性的影响。这条河位于Ardenne地区的南部,其特征是大型的蜿蜒曲折的河道,狭窄的洪泛区,很少的卵石条,大量的基岩露头和有限的沉积物。床层特别平整,浅,经常达到堤岸满溢(130m〜3s〜(-1))(0.9yr)。卵石示踪剂可以确定关键参数(流量,盾构准则和水流功率),动员的沉积物直径和沉积物传输距离。一次大型的挖泥运动导致形成了一条长约1 km,深2 m的河道,该河道起到了沉积物陷阱的作用。挖泥运动前后的地形断面以及4年后的地形断面都可以估算出床荷(1.1 t km〜(-1)yr〜(-1))。为了检验沉积物捕集器的效率,应用了Meyer-Peter和Mueller,Schoklitsch,Bagnold和Martin的沉积物迁移方程。除了Bagnold方程(1980)以外,观测到的输运值与理论上计算的相近。在1997年10月至2001年6月之间,有5010t被捕获在沉积物中。对于同一时期,这些方程式计算的值介于6147和105711之间。理论上的计算过高估计可能是由于盆地特征以及研究期间洪水事件的频率和大小而导致的泥沙供应不足。从沉积物传输速率的大小来看,预计在约10年后会返回到河床的初始状态(疏dr之前)。尽管对这种规模的河流进行了大规模的疏campaign行动,但其防洪效果有限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号