...
首页> 外文期刊>RAIRO operations research >PROJECT MANAGEMENT IN A COMPETITIVE ENVIRONMENT: INTERDICTING A CPM BASED PROJECT AND ITS IMPLICATIONS
【24h】

PROJECT MANAGEMENT IN A COMPETITIVE ENVIRONMENT: INTERDICTING A CPM BASED PROJECT AND ITS IMPLICATIONS

机译:竞争环境中的项目管理:限制基于CPM的项目及其影响

获取原文
获取原文并翻译 | 示例
           

摘要

There are two opponents in a classic network interdiction problem, network owner/defender and interdictor/attacker. Each side has enough information about the other's possible courses of action. While the network user wishes to run the network in an optimal way, the attacker with the limited resources tries to prevent the optimal operation of the network by interdicting the arcs/nodes of the network. In this study, we investigate project management in a competitive environment using a network interdiction approach. We assume that the project owner/manager strives to minimize the completion time of a Critical Path Method (CPM) based project while an opponent attempts to maximize the minimum completion time by inflicting some delays on project activities with available interdiction resources. Considering both discrete and continuous delay times, we develop two bi-level mixed-integer programming models for the interdictor. Using duality, we then convert the bi-level models to standard single-level models, which are solvable through standard optimization packages. We extend these models to find efficient solutions in terms of project completion time and interdiction resources from the interdictor's perspective. In this respect, we develop an algorithm to find an efficient solution set for the interdictor. Next, from project manager's standpoint, we discuss the earliest and latest scheduling times of activities in case of interdiction. Finally, we apply the developed techniques in a marketing project aiming at introducing a new product. The findings may enhance a better project management in an environment where an opponent can adversely affect the project management process by delaying some activities.
机译:经典网络拦截问题,网络所有者/防御者和算术家/攻击者有两个对手。每一方都有足够的信息有关其他可能的行动课程。虽然网络用户希望以最佳方式运行网络,但是具有有限的资源的攻击者尝试通过打破网络的弧/节点来防止网络的最佳操作。在这项研究中,我们使用网络互通方法调查竞争环境中的项目管理。我们假设项目所有者/经理努力最大限度地减少基于关键路径方法(CPM)项目的完成时间,而对手试图通过造成可用互通资源的项目活动的一些延迟来最大限度地提高最低完成时间。考虑到离散和连续的延迟时间,我们为算法开发了两个双级混合整数编程模型。使用二元性,我们将双级模型转换为标准单级模型,可通过标准优化包来解决。我们扩展了这些模型,以在项目完成时间和interdictor的角度来看有效的解决方案。在这方面,我们开发了一种算法来查找为算子设置的有效解决方案。接下来,从项目经理的角度来看,我们讨论了互通的最早和最近的活动时间表。最后,我们在旨在引入新产品的营销项目中应用开发技术。调查结果可以通过延迟一些活动来增强对手可能对项目管理流程产生不利影响的环境中的更好的项目管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号