首页> 外文期刊>Railways Illustrated >EMR receives its first Class 360s
【24h】

EMR receives its first Class 360s

机译:EMR收到其第一级360s

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

WITH EAST Midlands Railway currently expected to introduce its delayed electric services to Wellingborough and Corby from next May, the operator finally received its first Class 360s in early November. In a trio of moves between November 10-12, 2020 GB Railfreight provided 50007 and 50049 to haul 360120, 360103 and lastly 360121 from Ilford to Cricklewood, from where EMR will be able to commence staff training on the class and test running of a 12-car formation under the new electrification. They were joined by 360104, 360113 and 360116 on November 17.
机译:随着东米德兰兹的铁路目前预计将从下一个5月份向Wellingborough和Corby推出其延迟电力服务,运营商终于在11月初获得了第一级360年代。在11月10日至12日之间的三大动作中,提供了50007和50049的2020 GB轨道运输,360120,360103,360103,最后360121来自Ilford到Cricklewood,从那里EMR将能够在课堂上开始工作人员和12级 - 在新电气化下形成。他们于11月17日加入360104,360113和360116。

著录项

  • 来源
    《Railways Illustrated》 |2021年第1期|20-20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号