首页> 外文期刊>Railway Track and Structures >C&S Functional Group update
【24h】

C&S Functional Group update

机译:C&S功能组更新

获取原文
获取原文并翻译 | 示例
       

摘要

This month I have asked Frederick Gratke, vice president of the Communications & Signals Functional Group, to introduce and tell what is happening within his group. Fred is director telecommunications for BNSF. Assisting Fred are the two directors: E. Keith Holt, deputy chief engineer C&S for Amtrak and Richard P. Bowden, assistant director signal for BNSF. Here is Fred's update.
机译:本月,我请通信与信号功能部副总裁弗雷德里克·格拉特克(Frederick Gratke)介绍并讲述其小组中正在发生的事情。弗雷德(Fred)是BNSF的电信主管。协助Fred的是两位董事:Amtrak的C&S副总工程师E. Keith Holt和BNSF的助理信号主管Richard P. Bowden。这是弗雷德的更新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号