首页> 外文期刊>Railway Track and Structures >MAXIMIZING THE BENEFITS OF BALLAST MAINTENACE
【24h】

MAXIMIZING THE BENEFITS OF BALLAST MAINTENACE

机译:最大限度地维护压载物

获取原文
获取原文并翻译 | 示例
       

摘要

Much of the undercut waste fine material added to the track migrated downward and outward from the track, particularly in the first few weeks and months after placement. This could have happened during watering events and vibration from train traffic. Observers also noted that subsequent ballast sampling events did not display the expected coloration that would normally be present with the infiltration levels of carbon-rich fine material. This may be another indication that carbon-rich waste was transported out of the track section.
机译:添加到轨道上的许多底切废料会从轨道向下和向外迁移,特别是在放置后的最初几周和几个月内。这可能是在浇水事件和火车交通引起的振动期间发生的。观察员还指出,随后的压舱物取样事件并未显示出预期的着色,而预期的着色通常会随着富碳细料的渗透水平而出现。这可能是富碳废物被运出轨道部分的另一种迹象。

著录项

  • 来源
    《Railway Track and Structures》 |2016年第1suppla期|47-4850-51|共4页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:22:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号