首页> 外文期刊>Railway Track and Structures >CTA Invests Nearly $4M in Addison Red Line Track Improvements
【24h】

CTA Invests Nearly $4M in Addison Red Line Track Improvements

机译:CTA在Addison红线赛道改善项目上投资近400万美元

获取原文
获取原文并翻译 | 示例
       

摘要

THE CHICAGO TRANSIT AUTHORITY (CTA) is investing nearly $4 million in railroad track improvements at its Addison Red Line station, the authority announced. The project is expected to provide a smoother ride on the CTA's busiest rail line in addition to eliminating a slow zone and track conditions that could lead to future slow zones. The planned track upgrades will ensure reliable service on the CTA's Red and Purple lines during future construction work for the Red and Purple Modernization (RPM) Phase One Project.
机译:芝加哥交通管理局(CTA)宣布,将在其艾迪生红线车站投资近400万美元用于铁路轨道的改善。该项目有望消除C​​TA最繁忙的铁路线,并消除较慢的区域和可能导致将来出现较慢区域的轨道条件。计划中的航迹升级将确保在红色和紫色现代化(RPM)一期项目的未来建设工作中,为CTA的红色和紫色线上提供可靠的服务。

著录项

  • 来源
    《Railway Track and Structures》 |2019年第4期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:23:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号