...
首页> 外文期刊>Railway Gazette International >'Flying leopard' nears completion
【24h】

'Flying leopard' nears completion

机译:“飞豹”即将完工

获取原文
获取原文并翻译 | 示例
           

摘要

Monitoring: Taking shape in the assembly shops of Tangshan Railway Vehicle Co and Changchun Railway Vehicle Co is the CIT400 infrastructure Inspection train. Designed for continuous inspection at 350 km/h with a maximum test speed of 450 km/h, this eight-car 25 kV 50 Hz trainset has a novel design of front end which Chinese engineers say resembles a 'flying leopard'. All eight cars are powered, with four traction transformers mounted on separate cars; all eight cars have their own traction converters, and there are seven auxiliary converters. Developing 18400 kw at the wheel rim, the train has a peak output of 20800 kW.
机译:监控:唐山有轨电车公司和长春有轨电车公司的装配车间正在成型,是CIT400基础设施检查列车。这款八车25 kV 50 Hz列车组设计用于以350 km / h的速度进行连续检查,最大测试速度为450 km / h,其前端设计新颖,中国工程师称其类似于“飞豹”。全部八辆汽车都带有动力,在单独的汽车上安装了四个牵引变压器。所有八辆汽车都有自己的牵引变流器,还有七个辅助变流器。车轮轮辋的功率为18400 kw,峰值功率为20800 kW。

著录项

  • 来源
    《Railway Gazette International》 |2011年第1期|p.66|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号