【24h】

High speed to Orihuela

机译:高速到orihuela

获取原文
获取原文并翻译 | 示例
           

摘要

Prime Minister Pedro Sanchez Perez-Castejon participated in celebrations on February 1 to open the first phase of a high speed line to Murcia. The 38.3 km branch diverges from the Madrid - Alacant route at Monforte del Cid to serve new stations at Elche and Orihuela Miguel Hernandez. Designed for 350 km/h operation, the double-track line is electrified at 25 kV 50 Hz and equipped with both ETCS Level 2 and ASFA Digital ATP. Renfe Operadora is initially providing two trains each way per day using Talgo Series 102 trainsets, but says services would be increased as demand grows, subject to the Covid-19 crisis. No timescale has been confirmed For opening of the next 23.6 km from Orihuela to Murcia del Carmen, or a planned extension along the coast to Almeria.
机译:Pedro Sanchez Perez-Castejon总理参加了2月1日的庆祝活动,以打开穆尔西亚高速线的第一阶段。 Monforte del Cid的38.3公里分支机构来自Madforte del Cid的新航线,为Elche和Orihuela Miguel Hernandez提供新电台。设计为350 km / h运行,双轨线以25 kV 50 Hz电气化,配备ETPS等级2和ASFA数字ATP。 Renfe Operadora最初使用Talgo系列102列车每天提供两列火车,但随着需求的增长,服务将增加,受Covid-19危机。距离orihuela到Murcia del Carmen的orihuela开幕,没有确认Timescale没有确认23.6公里,或者沿着海岸到阿尔梅里亚的计划延伸。

著录项

  • 来源
    《Railway Gazette International》 |2021年第3期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号