...
首页> 外文期刊>Rail >Doncaster Sheffield Airport pursues rail link despite DfT rejection
【24h】

Doncaster Sheffield Airport pursues rail link despite DfT rejection

机译:尽管DFT拒绝,但Doncaster谢菲尔德机场追求铁路连接

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Doncaster Sheffield Airport is to continue developing plans for a rail link, despite the Department for Transport rejecting proposals on the grounds of "significant concerns". The DfT said it made the decision after rigorous assessment of the £300 million scheme. But in response, an airport spokesman told RAIL: "In order to properly assess the business case for GatewayEast rail, it is important to consider the economic benefits as a whole rather than the benefit of the transport cost-ratio in isolation, which is widely criticised as not being fit for purpose,
机译:唐卡斯特谢菲尔德机场是继续开展铁轨链接的计划,尽管有关“重要关注”的拒绝提案。 DFT表示,它在严格评估了3亿英镑的计划后做出了决定。但是,作为回应,机场发言人被告知铁路:“为了妥善评估门道前沿的商业案例,重要的是要考虑整体经济效益,而不是孤立地运输成本比的益处,这是广泛的批评不适合目的,

著录项

  • 来源
    《Rail》 |2020年第917期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号