Having announced his decision to resume work on the Extraordinary Review, on September 21 PPP Arbiter Chris Bolt published the results of his initial analysis of the reference made by Metronet BCV. In its submission of June 28 (RB1297 p1), the company sought an increase of £992m in the Infrastructure Service Charge paid by London Underground over the first seven and half year review period of the PPP contract. Bolt now believes that 'the appropriate figure for an efficient company' would be in the range of €140m to £470m. Although no reference has been made by Metronet SSL for an Extraordinary Review, Bolt has also reviewed its latest financial model which shows an underlying increase in costs against the baseline of some £1·1bn during the first review period. According to the Arbiter, the potential scale of the increase in efficient and economic costs recoverable by Metronet SSL is likely to be in the range of £230m to £600m.
机译:PPP仲裁人Chris Bolt在宣布决定恢复非凡审查的决定后,于9月21日发表了他对Metronet BCV的参考文献的初步分析结果。在6月28日提交的文件(RB1297 p1)中,该公司要求在PPP合同的前七个和半年审查期内,伦敦地铁支付的基础设施服务费增加9.92亿英镑。博尔特现在认为,“对一家高效公司而言合适的数字”将在1.4亿欧元至4.7亿英镑之间。尽管Metronet SSL尚未进行任何特别审查,但Bolt也审查了其最新财务模型,该模型显示,在第一个审查期间,与基准相比,成本出现了根本性增长,约为10亿英镑。根据仲裁人的说法,Metronet SSL可收回的效率和经济成本增加的潜在规模可能在2.3亿英镑至6亿英镑之间。

著录项

  • 来源
    《Rail Business Intelligence》 |2007年第303期|5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:17:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号