首页> 外文期刊>Rail Business Intelligence >ORR to rule on Crossrail track access
【24h】

ORR to rule on Crossrail track access

机译:ORR决定对Crossrail轨道的访问

获取原文
获取原文并翻译 | 示例
       

摘要

Noon on March 17 was the deadline for interested parties to make representations before ORR publishes its final determination later this month on the terms of the 50-year Crossrail Track Access Option, for which Network Rail and the Department for Transport formally applied on July 23 2007. The TAO reserves rights for Crossrail passenger services to operate on the Great Western Main Line between Paddington and Maidenhead, including the branch to Terminal 5 at Heathrow, and also between Stratford and Shen-field on the Great Eastern Main Line. It does not apply to the new line to Abbey Wood nor the Cross-rail tunnels under central London.
机译:3月17日中午是有兴趣的各方进行陈述的截止日期,然后ORR在本月晚些时候发布有关50年期Crossrail Track Access Option条款的最终决定之前,Network Rail和运输部已于2007年7月23日对此正式申请。TAO保留Crossrail客运服务的权利,以在帕丁顿和梅登黑德之间的大西部干线,包括希思罗机场5号航站楼的分支以及大东方干线的斯特拉特福德和申菲尔德之间运行。它不适用于通往Abbey Wood的新线,也不适用于伦敦市中心下的Cross-rail隧道。

著录项

  • 来源
    《Rail Business Intelligence》 |2008年第314期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:17:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号