首页> 外文期刊>Rail business intelligence >Rail Freight Group wants ORR to regulate High Speed 1
【24h】

Rail Freight Group wants ORR to regulate High Speed 1

机译:铁路货运集团希望ORR规范高速1

获取原文
获取原文并翻译 | 示例
       

摘要

July 17 is the dosing date for the latest round of consultation on the regulatory structure for High Speed 1 proposed by DfT and infrastructure manager HS1 Ltd. Consultees are protesting at the short time allowed for responses.rnRail Freight Group Chairman Lord Berkeley wrote to Transport Secretary Lord Adonis on July 1 demanding to know why complete documentation on a draft network statement and related arrangements for access to HS1 was sent to interested parties only on June 26 (even though the covering letter was dated June 19), allowing just three weeks for the preparation of a response.
机译:7月17日是DfT和基础设施经理HS1 Ltd提议的最新一轮有关高速1监管结构咨询的投稿日期。受咨询者在允许的短时间内提出抗议。rn铁路货运集团董事长伯克利勋爵致信运输部长Adonis勋爵在7月1日要求了解为什么仅在6月26日才将有关网络声明草案和访问HS1的相关安排的完整文档发送给感兴趣的各方(即使求职信日期为6月19日),而对于该声明仅用了三周时间准备回应。

著录项

  • 来源
    《Rail business intelligence》 |2009年第346期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号