首页> 外文期刊>Rail business intelligence >Modular Signalling Strategy Explained
【24h】

Modular Signalling Strategy Explained

机译:模块化信令策略介绍

获取原文
获取原文并翻译 | 示例
       

摘要

The first time RBI heard 'modular signalling' mentioned by Network Rail as an option for secondary lines at a conference in September 2008 (RB1327 p8), we were frankly puzzled.rnAndrew Simmons, NR's Director, Future Train ft Operational Control Systems, revealed that a pilot project planned between Crewe and Nantwich offered the prospect of 'reduced operating costs'. We wondered at the time what could be more 'modular' than a straightforward resignalling project with SSI modules, points and signals installed as required along with axle-counters for train detection.rnThe subject was raised again last month by NR's Head of Commercial,rnSignalling, Power ft Communications, Brian Neave at the 1RSE seminar (above). 'We have developed also in the last two or three years - and are now about to start rolling out for development - a modular signalling scheme', he said.
机译:在2008年9月的一次会议上(RB1327 p8),RBI第一次听到Network Rail提到的“模块化信号”作为辅助线路的一种选择,我们感到很困惑。克鲁和南特威奇之间计划的试点项目提供了“降低运营成本”的前景。当时我们想知道,有什么比一个简单的重新签名项目更“模块化”的了,该项目具有按需安装的SSI模块,点和信号以及用于火车检测的车轴计数器。rn这个问题是由NR的商务主管上个月再次提出的。 Power ft Communications的Brian Neave在1RSE研讨会上(上)。他说:“在过去的两三年中,我们也已经发展了-现在将要开始开发-一种模块化的信令方案。”

著录项

  • 来源
    《Rail business intelligence》 |2009年第339期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号