首页> 外文期刊>Rail Business Intelligence >Cambrian ETCS live at last
【24h】

Cambrian ETCS live at last

机译:寒武纪ETCS直播

获取原文
获取原文并翻译 | 示例
       

摘要

Following a final round of driver training that saw the line between Harlech and Pwllheli closed to passengers over the last weekend in October, Arriva Train Wales was finally permitted to operate its normal advertised service over this section under the control of ERTMS from October 29. This means that the UK has at last joined several other countries using ETCS Level 2, if only on 35 km of single track with one passing loop at Porthmadog.rnWhat NR's Senior Programme Manager responsible for the ERTMS Early Deployment Scheme on the Cambrian lines called 'a full dress rehearsal' took place on February 13 to 17 2010 (RB1361 pi), but that produced evidence of unreli-rnability requiring further work.
机译:经过最后一轮的驾驶员培训后,Harlech和Pwllheli之间的线路在10月的最后一个周末向乘客关闭,Arriva Train Wales终于从10月29日开始在ERTMS的控制下在这一部分进行常规的广告服务。这意味着,如果仅在Porthmadog的35 km单道上有一个通过环路,英国最终将使用ETCS 2级加入其他几个国家。NR负责寒武系ERTMS早期部署计划的NR高级项目经理称为“ a”礼服彩排”于2010年2月13日至17日(RB1361 pi)进行,但这产生了不可靠性的证据,需要进一步的工作。

著录项

  • 来源
    《Rail Business Intelligence》 |2010年第378期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号