首页> 外文期刊>Rail Business Intelligence >Timetable for W10 via Andover
【24h】

Timetable for W10 via Andover

机译:W10时间表通过Andover

获取原文
获取原文并翻译 | 示例
           

摘要

Network Rail announced on May 20 a programme of road and rail closures to enable the diversionary freight route between Southampton and Basingstoke via Andover to be cleared to the W10 loading gauge to accommodate 9 ft 6 in high containers on conventional wagons. The Eastleigh - Romsey route providing a connection to the South Western Main Line will also be cleared for further operational flexibility. The main line from Southampton to Basingstoke and on to Reading and Nuneaton was officially cleared to W10 on April 4 (RB1388 p3). NR now says 'the project was delivered more than £11 5m under the original £71m budqef.
机译:Network Rail于5月20日宣布了一项道路和铁路封闭计划,以使通过安多佛(Southover)从安普顿(Southampton)和贝辛斯托克(Basingstoke)之间的改道货运路线清理为W10装载量表,以容纳9英尺6英尺的传统货车高箱。连接到西南干线的Eastleigh-Romsey路线也将清理,以提高操作灵活性。从南安普敦到贝辛斯托克以及雷丁和纽尼顿的干线已于4月4日正式清理为W10(RB1388 p3)。 NR现在说,“与最初的7100万英镑的预算相比,该项目的交付额超过了1100万英镑。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第390期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号