首页> 外文期刊>Rail Business Intelligence >DLR three-car works completed
【24h】

DLR three-car works completed

机译:DLR三车工程完成

获取原文
获取原文并翻译 | 示例
           

摘要

The introduction of three-car trains between Tower Gateway and Beck-ton on May 9 marked completion of the £325m programme to increase capacity on the Docklands Light Railway. According to TfL, this programme which began in early 2007 was completed 'on time and within budget'.'With passenger numbers increasing on the DLR every year, having the ability to run a three-car service right across this crucial piece of our transport network is vital', said Mayor of London Boris Johnson. 'The 5O°/o increase in capacity and longer platforms to accommodate them have been delivered bang on time and more than a year ahead of the 2012 games.'
机译:5月9日,在塔楼门户和贝克顿之间引入了三车厢火车,这标志着3.25亿英镑的计划的完成,以增加Docklands轻铁的运力。根据TfL的说法,该计划始于2007年初,``按时且在预算之内''完成了。随着DLR上的乘客人数逐年增加,有能力在我们这一至关重要的运输过程中提供三厢车服务网络至关重要”,伦敦市市长鲍里斯·约翰逊(Boris Johnson)说。 “容量增加了5O°/ o,并提供了更长的平台来容纳它们,比2012年奥运会提前了一年多。”

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第390期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号