首页> 外文期刊>Rail Business Intelligence >RAIB considers winter braking
【24h】

RAIB considers winter braking

机译:RAIB考虑冬季制动

获取原文
获取原文并翻译 | 示例
       

摘要

The last two winters have seen a number of incidents where trains have suffered partial braking failures during sub-zero weather. RAIB reviews the complex reasons for this in its report on a near-miss involving a freight train and two passenger trains at Carstairs on December 22 2009. The freight train was 4L81 operated by Freightliner which left Coat-bridge at 19.21 heading for Tilbury. It consisted of 22 container flats hauled by two Class 86/6 electric locomotives, and was almost full with a trailing load of 1 275 tonnes.
机译:在过去的两个冬季中,发生了许多事故,火车在低于零的天气中部分制动失败。 RAIB在其有关2009年12月22日在Carstairs的货运列车和两列旅客列车的未遂事故报告中回顾了这一复杂原因。货运列车是由Freightliner运营的4L81,于19.21离开高登桥前往蒂尔伯里。它由22个集装箱舱室组成,由两个86/6级电力机车拖运,几乎已满,拖曳载荷为1,275吨。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第383期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号