Alliance proposes to run up to 60 trains a day on the WCML from the 2015 timetable. Trains will be operated by The Great North Western Railway Co Ltd and will be worked by new rolling stock capable of the maximum line speed. Trains are proposed to operate on the following routes:1.Leeds and Huddersfield to London Euston2.Bradford, Halifax and Rochdale to London Euston.
展开▼
机译:联盟提议从2015年的时间表开始每天在WCML上运行多达60列火车。火车将由Great North Western Railway Co Ltd经营,并且将由具有最大线速度的新机车车辆运营。建议火车按以下路线运行:1.利兹和哈德斯菲尔德到伦敦尤斯顿2.布拉德福德,哈利法克斯和罗奇代尔到伦敦尤斯顿。
展开▼