首页> 外文期刊>Rail Business Intelligence >DB Schenker wins Malcolm contract
【24h】

DB Schenker wins Malcolm contract

机译:德铁信可(DB Schenker)赢得马尔科姆(Malcolm)合同

获取原文
获取原文并翻译 | 示例
       

摘要

DB Schenker Rail UK announced on April 28 that it had won 'a major new three-year contract', covering the operation of inter-modal services for Malcolm Group between Daventry International Rail Freight Terminal and Mossend Euroterminal near Motherwell. The contract was previously held by DRS, and DB Schenker says that its winning offer is based on a schedule 'that enables a single train to complete the round trip in just 24 h', compared to the one train in each direction that had been required 'to maintain the strict delivery schedule demanded by the contract'. The more 'streamlined' service developed by DB Schenker introduces 'considerable time efficiencies and cost savings, using electric traction to reduce journey times'.
机译:DB Schenker英国铁路公司于4月28日宣布,已赢得“一项重要的新三年合同”,该合同涵盖了达文垂国际铁路货运站和马瑟韦尔附近的Mossend Euroterminal之间的Malcolm集团联运服务。该合同先前是由DRS持有的,DB Schenker说,它的中标报价是基于“使一列火车能够在24小时内完成往返行程”的时间表,而不是在每个方向上的一列火车“保持合同要求的严格交货时间表”。 DB Schenker开发的更加“简化”的服务引入了“相当大的时间效率和成本节省,利用电力牵引减少了出行时间”。

著录项

  • 来源
    《Rail Business Intelligence》 |2014年第461期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号