首页> 外文期刊>Rail Business Intelligence >Difficult start for GTR
【24h】

Difficult start for GTR

机译:GTR开局困难

获取原文
获取原文并翻译 | 示例
       

摘要

Since it began operating the Thameslink, Southern ft Great Northern franchise on September 14 2014, Govia Thameslink Railway has had to grapple with a number of infrastructure issues, predominantly track and signalling problems on the Brighton Main Line. There were also an unprecedented number of fatalities in the first eight weeks of operations, which particularly affected the GTR PPM score in periods 6 and 7 of 2014-15 (p4). Infrastructure issues continued throughout periods 8 and 9, particularly on the Thameslink route, which as GTR notes was 'consistent with the downward trend in performance over the previous 1 5 months'. An alliance with Network Rail was launched to deliver an investment programme to address the worst-performing assets.
机译:自2014年9月14日开始运营位于南部北方地区北部的Thameslink连锁店以来,Govia Thameslink铁路公司不得不应对许多基础设施问题,主要是在布莱顿干线上进行跟踪和发出信号。在运营的前八周,也有前所未有的死亡人数,这尤其影响了2014-15年度第6和第7阶段的GTR PPM评分(p4)。基础设施问题在第8和第9阶段一直持续,特别是在Thameslink路线上,正如GTR指出的那样,“与前1到5个月的性能下降趋势一致”。与Network Rail结盟,启动了一项投资计划,以应对表现最差的资产。

著录项

  • 来源
    《Rail Business Intelligence》 |2015年第484期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号