首页> 外文期刊>Rail Business Intelligence >Mixed picture in P11 PPMs
【24h】

Mixed picture in P11 PPMs

机译:P11 PPM中的混合图片

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail reports that the national average PPM score for Period 11 to January 31 was 87.9%, with the national average MAA ending the period at 89.5%. During P11, 61% of delays were attributed to MR, 27% to TOC-on-self and 12% to TOC-on-TOC. Topping the table once again, c2c noted that its strong punctuality record was reflected in the latest National Rail Passenger Survey which showed that 91% of passengers surveyed were satisfied with train punctuality (RBI479 p4). 'We're proud that c2c passengers are the most satisfied in the UK with the punctuality of their train service', said c2c Managing Director Julian Drury. 'Over the coming year we aim to extend our reputation for reliability while delivering other journey improvements'.
机译:Network Rail的报告显示,第11期间至1月31日的全国平均PPM得分为87.9%,而该期间的全国平均MAA得分为89.5%。在P11期间,61%的延迟归因于MR,27%归因于TOC-on-TOC,12%归因于TOC-on-TOC。 c2c再次位居榜首,指出其强大的守时记录已在最新的《国家铁路乘客调查》中得到反映,该调查显示,接受调查的乘客中有91%对火车守时感到满意(RBI479 p4)。 c2c董事总经理朱利安·德鲁里(Julian Drury)表示:“我们为c2c乘客对他们的火车服务的准时性感到最满意而感到自豪”。 “在未来的一年中,我们的目标是在提高可靠性的同时扩大其他旅程”。

著录项

  • 来源
    《Rail Business Intelligence》 |2015年第480期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号