On April 7 HS2 Ltd announced the start of tendering for contracts to undertake detailed design of the four stations on Phase 1 of the high-speed line. A separate com-petition is also being held to select a Master Development Partner for London Euston. Interested parties can bid for all four station design contracts, cov-ering Birmingham Curzon Street, Birmingham Interchange, Old Oak Common and London Euston, but would be awarded a maximum of one. The Master Development Partner would work with HS2 Ltd, Network Rail, the winner of the Euston design contract and local authorities to advise on, and later take forward, development oppor-tunities for residential, commercial and retail space above and around the station.
展开▼
机译:4月7日,HS2 Ltd宣布开始招标合同,以对高速线路一期的四个车站进行详细设计。还将举行另一场比赛,以选择伦敦尤斯顿大学的总发展合作伙伴。有兴趣的人士可以竞标所有四个站的设计合同,包括伯明翰柯松街,伯明翰立交桥,Old Oak Common和伦敦尤斯顿,但最多只能获得一份。总体开发合作伙伴将与HS2 Ltd,Network Rail,Euston设计合同的获胜者以及地方当局合作,为该站上方和周围的住宅,商业和零售空间提供开发建议,并随后提出建议。
展开▼