The Sludge Cleanout of Hanford's K Basins

机译:汉福德K盆地的污泥清除

获取原文
获取原文并翻译 | 示例
           

摘要

Hanford workers completed a job analogous to "vacuuming under the bed in your child's room from a small hole in the ceiling above, without first picking up the toys." Victories in cleaning out the now-famous K Basins at the Hanford Site in southeast Washington State have come in rapid succession during the past year, after three years of determined effort since the spent fuel was removed in 2004. When Fluor Hanford, prime cleanup contractor to the Richland Operations Office (RL) of the U.S. Department of Energy, completed removing more than 4 million pounds of deteriorated spent fuel in October 2004, the job of cleaning out the aging basins was not finished. About 52 cubic yards (40 cubic meters) of sludge clogged the basins—enough to fill about eight standard dump trucks if the sludge were dry. Approximately three-fourths of it formed in the K East Basin.
机译:汉福德的工人完成了类似于“从孩子的房间的床下面的天花板上的一个小孔中抽真空,而无需先捡起玩具”的工作。自从2004年清除乏燃料以来,经过三年的坚定努力,过去一年来,在华盛顿州东南部汉福德基地清理著名的K盆地的工作迅速取得了胜利。美国能源部Richland操作办公室(RL)于2004年10月完成了清除超过400万磅变质乏燃料的工作,清理老化盆地的工作尚未完成。约52立方码(40立方米)的污泥堵塞了水盆-如果污泥是干的,则足以填满约8辆标准自卸车。它的大约四分之三形成于K东盆地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号