Detailed planning of deliveries and transport had to be conducted before Colas embarked forTiree - not least, for working out how and if Colas could get their mobile plant to the island's airport. 'A lot of planning went into that,' said Colas's business manager for airfields, Carl Fergusson. 'A detailed storage plan was produced to show the plant could be stowed to maritime rules, with each trailer reversed on to the ferry so that they came off in the right direction at Tiree. Even then, we had only one day available for the trip in the month, because the plant could only be disembarked on the highest tide.'
机译:在Colas着手准备Tiree之前,必须对交付和运输进行详细的计划-尤其重要的是,要弄清楚Colas如何以及是否可以将其移动工厂运送到岛上的机场。可乐的飞机场业务经理卡尔·弗格森(Carl Fergusson)说,“其中做了很多计划。” ``制定了详细的存储计划,以表明该工厂可以按照海事规则存放,每辆拖车都倒转到渡轮上,以便它们在蒂勒的正确方向驶出。即使那样,我们也只有一个月的行程时间,因为工厂只能在涨潮时下船。

著录项

  • 来源
    《Quarry Management》 |2008年第1期|p.30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号