...
首页> 外文期刊>Quarry Management >Metso assist in dewatering Celtic Energy's East Pit site
【24h】

Metso assist in dewatering Celtic Energy's East Pit site

机译:美卓协助凯尔特能源东坑现场脱水

获取原文
获取原文并翻译 | 示例
           

摘要

Celtic Energy are the leading coal mining operators in South Wales, with four surface coal mining sites - Selar, Nant Helen, Margam and East Pit - producing in excess of 1 million tonnes of high-quality coal each year for domestic, industrial and electrical-generation demand in the UK and elsewhere in Europe.rnLast year, due to favourable market conditions, preliminary works began to reopen the company's East Pit site, which had lain dormant since 2001 and, as a result, had accumulated a large body of water in the existing excavated void.
机译:凯尔特能源公司(Celtic Energy)是南威尔士州的主要煤矿运营商,拥有四个露天煤矿场-Selar,Nant Helen,Margam和East Pit-每年为国内,工业和电力生产超过100万吨的优质煤炭,英国和欧洲其他地方的发电需求。去年,由于有利的市场条件,前期工作开始重新开放该公司的East Pit工厂,该工厂自2001年以来一直处于休眠状态,结果在该州积累了大量水现有的挖掘空洞。

著录项

  • 来源
    《Quarry Management》 |2009年第10期|12-14|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号