The Quarry Regulations 1999 require specific measures to be taken to ensure the stability and safety of excavations and tips. Careful planning and execution of working and residual faces can achieve this. Where the face is already in existence but cannot be stabilized by scaling or re-profiling, there are other, modern, cost-effective solutions available. These solutions continue to evolve, thus assisting compliance with the requirements.
展开▼