...
首页> 外文期刊>Quarry Management >Sheehan Group reach recycled aggregate milestone
【24h】

Sheehan Group reach recycled aggregate milestone

机译:Sheehan Group Reach Reached Explete Mile节

获取原文
获取原文并翻译 | 示例
           

摘要

The Sheehan Group have produced around 330,000 tonnes of recycled sand - the same volume of sand products that were used to build the world's tallest building, the Burj-Khalifa, in Dubai. The Oxfordshire-based recycling firm produces high-grade construction quality coarse sand and fine sand at its Dix Pit recycling site, where a CDE wet-processing plant has saved around 825,000 tonnes of C&D waste going to landfill since 2012. Last year, Sheehan Group became one of the first waste-recycling operators in the UK to benefit from density separation technology, as part of a major upgrade to its CDE reprocessing facility for the supply of higher-quality recycled sand products.
机译:Sheehan集团生产了大约330,000吨的回收砂 - 相同的沙子产品,用于建造世界上最高的建筑,迪拜的Burj-Khalifa。基于牛津郡的回收公司在其Dix坑回收站生产高档施工质量粗砂和细砂,自2012年以来,CDE湿法加工厂已挽救825,000吨C&D废物。去年,Sheehan集团成为英国的第一个废物回收运营商之一,从密度分离技术中受益,作为其CDE再处理设施供应更高质量的再循环砂产品的主要升级的一部分。

著录项

  • 来源
    《Quarry Management》 |2020年第10期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号