首页> 外文期刊>Quality and Reliability Engineering International >Optimizing the Periodic Inspection Interval for a 1-out-of-2 Cold Standby System Using the Delay-Time Concept
【24h】

Optimizing the Periodic Inspection Interval for a 1-out-of-2 Cold Standby System Using the Delay-Time Concept

机译:使用延迟时间概念优化2分之一冷备用系统的定期检查间隔

获取原文
获取原文并翻译 | 示例
       

摘要

In this article, we deal with a 1-out-of-2 system with a cold-standby component. The failure process of these two components is statistically identical and characterized by the delay-time concept, which divides the component's life into a two-stage process with a normal stage from new to a defect initiation point and a following failure delay stage from this point to failure. A fixed interval periodic inspection is carried out to check whether the working component is defective or not. If a defect is identified, the working component is shut down and sent to be repaired. The repair shop capacity is limited for repairing one component only. If the repair shop is occupied by the standby component (under repair) when the working one is failed, the system is shut down. There are five scenarios of the state of the system at an inspection epoch, which are derived analytically. The expected total cost per unit time of the system consists of the expected cost caused by preventive repair, unplanned failure repair, and system downtime. In this article, these three costs are determined and the optimal inspection interval with respect to the minimum of the expected total cost per unit time is found. To incorporate a nonexponential distribution for the normal time, delay stages, and repair time of the components, the elapsed time in the normal time, delay stages, and repair time at inspection is taken into consideration. A stationary distribution of the elapsed time exists, and it is calculated by an iteration method.
机译:在本文中,我们讨论了带有冷备用组件的1-of-of-2系统。这两个组件的故障过程在统计上是相同的,并以延迟时间概念为特征,该概念将组件的寿命分为两个阶段,正常阶段从新阶段到缺陷起始点,随后是故障延迟阶段。失败。定期进行定期检查以检查工作组件是否有缺陷。如果发现缺陷,则将工作部件关闭并送去维修。维修车间的能力仅限于维修一个组件。如果工作部件发生故障时,维修车间被备用部件占用(正在维修),则系统将关闭。在检查时期有五种系统状态的方案,它们是通过分析得出的。系统每单位时间的预期总成本包括预防性维修,计划外的故障维修以及系统停机所引起的预期成本。在本文中,确定了这三个成本,并找到了相对于每单位时间预期总成本中的最小值的最佳检查间隔。为了合并组件的正常时间,延迟阶段和修复时间的非指数分布,需要考虑正常时间,延迟阶段和检查时的修复时间的经过时间。存在经过时间的平稳分布,并通过迭代方法进行计算。

著录项

  • 来源
    《Quality and Reliability Engineering International》 |2012年第6期|p.648-662|共15页
  • 作者单位

    Department of Automation, Tsinghua University, Beijing, China,Jiu Quart Satellite Launch Center, Gansu, China;

    Dongling School of Economics and Management, University of Science and Technology Beijing, Beijing, China;

    Jiu Quart Satellite Launch Center, Gansu, China;

    Reliability Research Lab, University of Alberta, Edmonton, Canada;

    Department of Automation, Tsinghua University, Beijing, China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    delay-time concept; inspection; 1-out-of-2 system; cold standby;

    机译:延迟时间概念;检查;二选一系统冷待机;
  • 入库时间 2022-08-17 13:09:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号