首页> 外文期刊>Quality and Reliability Engineering International >On Modified Successive Sampling Based Control Charting Schemes
【24h】

On Modified Successive Sampling Based Control Charting Schemes

机译:基于改进的连续抽样的控制制图方案

获取原文
获取原文并翻译 | 示例
       

摘要

The presence of variation cannot be avoided in different kinds of manufacturing and non-manufacturing processes. A better understanding of the causes of variability in any process is necessary to improve the process. Control chart is a very frequently used tool for checking whether the process parameters are stable or not. The current study devises a sampling technique, named as modified successive sampling scheme, that is not only cost-effective but also efficient as compared with the simple random sampling scheme. A number of Shewhart-type control charts are proposed based on the said sampling scheme, and average run length is used as a performance indicator. Based on the average run length values, all the proposed charts are compared with existing Shewhart control chart for both positive and negative shifts in the process. Finally, the new proposals are applied to a real dataset where the variable of interest is an inner diameter of automobile engine piston rings made of steel. Copyright (c) 2015 John Wiley & Sons, Ltd.
机译:在不同类型的制造和非制造过程中,不可避免地会出现偏差。为了改进过程,必须更好地了解任何过程中的可变性原因。控制图是检查过程参数是否稳定的非常常用的工具。当前的研究设计了一种采样技术,称为改进的连续采样方案,与简单的随机采样方案相比,它不仅具有成本效益,而且效率高。基于所述采样方案,提出了许多Shewhart型控制图,并且平均游程长度被用作性能指标。根据平均行程长度值,将所有建议的图表与现有的Shewhart控制图进行比较,以了解过程中的正向和负向偏移。最后,将新建议应用于实际数据集,其中感兴趣的变量是钢制汽车发动机活塞环的内径。版权所有(c)2015 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号