首页> 外文期刊>EUWID Pulp and paper >Smurfit Kappa revamps PM 5 at Cellulose du Pin
【24h】

Smurfit Kappa revamps PM 5 at Cellulose du Pin

机译:Smurfit Kappa在Cellulose du Pin改造5号纸机

获取原文
获取原文并翻译 | 示例
           

摘要

Irish Smurfit Kappa group began rebuilding PM 5 as announced at its French Cellulose du Pin mill and plans to complete the task by the end of February. A company spokesman confirmed that PM 5 is scheduled to resume operation at the beginning of March and would be able to produce up to 45,000 tpy more than before. PM 5 produces white kraftliner and machine capacity will amount to around 220,000 tpy after the rebuild.The rebuild mainly involves renewing components of the dryer section with the aim of improving paper quality besides increasing productivity and saving energy. Maintenance works were executed on PM 6 at the mill, which produces brown kraftliner, from 12 to 27 January, as well as in the mill's pulp production area. At the Swedish Pitea mill, where Smurfit Kappa produces brown and white kraftliner, a leak in the recovery boiler forced a production stop from 9 to 15 January. A company spokesman explained that the fault had been repaired and that the mill has since resumed normal operation. Smurfit Kappa runs two machines at the PiteS mill, which have a combined capacity of roughly 700,000 tpy.
机译:爱尔兰Smurfit Kappa集团开始在法国Cellulose du Pin工厂宣布重建5号纸机,并计划在2月底前完成任务。公司发言人证实,5号纸机计划于3月初恢复运行,将能够比以前多生产45,000吨。 5号纸机生产白色牛皮纸衬板,改造后的纸机产能将达到约22万吨/年。改造主要包括更新干燥机部分的组件,以提高纸张质量,同时提高生产率和节约能源。 1月12日至27日,工厂对生产棕色牛皮纸的工厂的6号纸机以及工厂的纸浆生产区进行了维护工作。在Smurfit Kappa生产棕色和白色牛皮纸的瑞典Pitea工厂,回收锅炉的泄漏迫使生产于1月9日至15日停止。公司发言人解释说,故障已得到修复,自此磨机已恢复正常运行。 Smurfit Kappa在PiteS工厂运行两台机器,合计产能约为70万吨/年。

著录项

  • 来源
    《EUWID Pulp and paper》 |2020年第7期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号