...
首页> 外文期刊>Public works >Protects Eroded Stream Bank
【24h】

Protects Eroded Stream Bank

机译:保护侵蚀的河岸

获取原文
获取原文并翻译 | 示例
           

摘要

In summer 1999, West Bouldin Creek in Austin, Texas, had experienced significant erosion of a 150-fl long, 22-ft high section of a bluff adjacent to the South Sixth Street roadway. At this location, a near 90-degree turn in the creek created focused flows and erosive forces that severely undercut the outside bank of the creek. The concentrated flows had undermined the embankment to the point where emergency repair had to be implemented before the roadway was impacted. The erosive shale foundation soils, combined with a significant overburden of limestone, complicated the problem.
机译:1999年夏季,得克萨斯州奥斯汀的西博丁溪遭受了150英尺长,22英尺高的断崖断面的严重侵蚀,该断面靠近南第六街巷。在这个位置,小溪将近90度的转弯产生了集中的水流和侵蚀力,严重侵蚀了小溪的外岸。集中的流量破坏了路堤,以至于在道路受到影响之前必须进行紧急维修。侵蚀性的页岩基础土壤,加上大量的石灰岩覆盖,使问题复杂化。

著录项

  • 来源
    《Public works》 |2001年第4期|p.36-38|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号