...
首页> 外文期刊>Public works >47 Bridges and Still on Schedule
【24h】

47 Bridges and Still on Schedule

机译:47座桥梁仍然如期

获取原文
获取原文并翻译 | 示例
           

摘要

Even with approximately 470 highway projects currently underway In Massachusetts, one massive effort is being watched with particular interest. No, it is not Boston's underground central artery project. It is a 21-mi stretch of Route 3 from Lowell to the New Hampshire border that is being widened from four lanes to six. The contractor, Modern Continental Construction Company (Cambridge, Massachusetts), is adding a travel lane and two 10-ft shoulders in each direction, constructing a visitor's center and a park-and-ride facility, making various environmental improvements―and building 47 new bridges along the route.
机译:即使马萨诸塞州目前正在进行约470个高速公路项目,但人们仍怀着极大的兴趣注视着巨大的努力。不,这不是波士顿的地下中央动脉项目。这是从洛厄尔(Lowell)到新罕布什尔州(New Hampshire)边界的三号干线21英里的延伸,从四车道扩大到六车道。承包商,现代大陆建筑公司(马萨诸塞州剑桥市)正在沿每个方向增加一条行车道和两个10英尺的路肩,建设了游客中心和公园骑乘设施,改善了各种环境,并新建了47座沿路线的桥梁。

著录项

  • 来源
    《Public works》 |2002年第13期|p.38-40|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号