...
首页> 外文期刊>Public works >Pumping away combined sewer overflows
【24h】

Pumping away combined sewer overflows

机译:抽走合并的下水道溢流

获取原文
获取原文并翻译 | 示例
           

摘要

Age and location have conspired against Cleveland. The city's century-old combined sewer system discharges into Lake Erie, a state EPA-designated "sensitive receiving water." The end result: a 2011 consent decree giving the Northeast Ohio Regional Sewer District 25 years to lower illegal discharges from 4.5 billion gallons to 494 million gallons a year. Begun in 2012, the second major component of the district's $3 billion Project Clean Lake long-term control plan is a rather unusual solution to the problem of undersized wastewater facilities: a pump station 240 feet below ground that stores combined sewer overflows during peak wet weather events. Once flows subside, the facility will dewater the storage tunnels and pump flows into the Easterly Interceptor where it will be conveyed by gravity to the Easterly Wastewater Treatment Plant.
机译:年龄和地理位置共同打击了克利夫兰。该市具有百年历史的联合下水道系统排入伊利湖,这是国家环保局指定的“敏感接收水”。最终结果是:2011年的一项同意法令赋予了东北俄亥俄地区下水道区25年的时间,将非法排放量从每年45亿加仑降低到4.94亿加仑。开始于2012年,该区耗资30亿美元的Clean Lake长期控制计划的第二个主要组成部分是解决污水处理厂规模过小的问题的一个非常不寻常的解决方案:一个泵站位于地下240英尺处,用于在潮湿的高峰天气中存储下水道的溢流事件。一旦水流消退,该设施将使存储隧道脱水,并将泵流送入东风拦截器,在重力作用下将其输送到东风废水处理厂。

著录项

  • 来源
    《Public works》 |2014年第11期|38-40|共3页
  • 作者

    Stephanie Johnston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号