首页> 外文期刊>Public works >An option to trenchless construction
【24h】

An option to trenchless construction

机译:非开挖施工的选择

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This is the story of how public agencies can collaborate to resolve environmental challenges in ways that are acceptable-and cost-effective-for both. The Pennsylvania DOT (PennDOT) is adding two lanes to four miles of state highway in Northampton County, a stretch that includes a bridge over Saucon Creek in the City of Bethlehem. Widening the bridge required more than 900 lineal feet of city-owned sanitary sewer to be relocated. The plan was to bury 48-inch steel carrier pipe beneath the creek bed and run the 30-inch sewer pipe through it. However, the creek is considered a high-quality watershed and home to native species of trout. Construction calendar restrictions for spawning had to be observed.
机译:这是关于公共机构如何通过双方都可以接受且具有成本效益的方式合作解决环境挑战的故事。宾夕法尼亚州交通运输部(PennDOT)在北安普敦县的四英里州际公路上增加了两条车道,其中包括在伯利恒市的索康河上的一座桥。拓宽桥梁需要搬迁900多英尺的城市拥有的下水道。计划是将48英寸的钢管埋在小河床下,然后将30英寸的下水道穿过其中。但是,小河被认为是优质的分水岭,是鳟鱼本地物种的家园。必须遵守产卵的施工日历限制。

著录项

  • 来源
    《Public works》 |2014年第3期|25-2628|共3页
  • 作者

    Kathryn Caggianelli;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号