首页> 外文期刊>Public utilities fortnightly >Preventing Tomorrows Blackouts
【24h】

Preventing Tomorrows Blackouts

机译:防止明天停电

获取原文
获取原文并翻译 | 示例
       

摘要

The three Ps of power system reliability are planning, protection and performance-and they're inter-related. Transmission planners are responsible for planning the transmission system and studying future transmission system conditions to ensure that its capable of handling anticipated needs. Future load growth, generation additions, transmission expansion, reconfiguration and changes in protection schemes are some of the key elements affecting grid reliability, and therefore a comprehensive reliability evaluation is needed on a periodic basis. The North American Electric Reliability Corp. (NERC) transmission planning (TPL) standards are guiding principles for transmission planners for conducting such evaluations.
机译:电力系统可靠性的三个要素是规划,保护和性能,它们是相互关联的。传输计划者负责规划传输系统并研究未来的传输系统状况,以确保其能够处理预期的需求。未来的负荷增长,增加的发电量,传输扩展,重新配置以及保护方案的更改是影响电网可靠性的一些关键因素,因此需要定期进行全面的可靠性评估。北美电力可靠性公司(NERC)的传输规划(TPL)标准是传输规划人员进行此类评估的指导原则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号