...
首页> 外文期刊>Property Week >Bristol's ship comes in as port objections sink
【24h】

Bristol's ship comes in as port objections sink

机译:布里斯托尔的船只进入了端口异议的沉沦

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Transport secretary geoff hoon could grant the Bristol Port Company a harbour revision order as early as this summer, thereby enabling it to begin work on a £600m deep water terminal.The port's chief executive, Simon Bird, announced last week that work could begin earlier than expected because bodies such as Natural England, the Royal Society for the Protection of Birds and the Highways Agency had withdrawn their objections.These, and other conservation bodies that have a right to be consulted, put down 'holding' objections when the port published its plans in July. But, having read the report, all withdrew them, obviating the need for a public inquiry.
机译:运输秘书杰夫呼迅可以在今年夏天授予布里斯托尔港公司的港口修订令,从而使其能够以600万英镑的深水端子开始工作。港口行政长官Simon Bird,上周宣布,工作可能比预期早于预期,因为天然英格兰,皇家鸟类和公路机构等皇家英格兰等人士撤回了他们的反对意见。当港口在7月份发布计划时,这些和其他有权被咨询的保护机构缩小了“持有”反对意见。但是,阅读报告,所有这些都撤消了他们,避免了对公众询问的需求。

著录项

  • 来源
    《Property Week》 |2009年第8期|69|共1页
  • 作者

    CHRISTINE EADE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号