首页> 外文期刊>Progressive Railroading >Bearing up under 286,000 pounds of pressure
【24h】

Bearing up under 286,000 pounds of pressure

机译:在286,000磅的压力下承受压力

获取原文
获取原文并翻译 | 示例
       

摘要

As axle loads climb, the pressure is on to produce rail car bearings that can take the weight and live to tell about it. Wheels, axles and bearings are the most expensive rail car components to maintain. All three must remain in good working order. Bearing failure, in particular, can result in significant train delays — and, in worst cases, derailments. As axle loads continue to get heavier — the maximum gross rail load is at 286,000 pounds and, possibly, rising — today's bearings need to be able to hold up under even more pressure.
机译:随着车轴载荷的上升,压力不断增加,从而产生了可以承受重量并能讲述这一点的有轨电车轴承。车轮,车轴和轴承是需要维修的最昂贵的轨道车部件。所有三个必须保持良好的工作状态。轴承故障尤其会导致严重的火车延误,甚至在最坏的情况下也会导致脱轨。随着车轴负载继续变得越来越重(最大总铁路负载为286,000磅,并且有可能上升),当今的轴承需要能够承受更大的压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号