首页> 外文期刊>Professional safety >Video Explains Prestart Inspections of Aerial Work Platforms
【24h】

Video Explains Prestart Inspections of Aerial Work Platforms

机译:视频介绍了高空作业平台的启动前检查

获取原文
获取原文并翻译 | 示例
           

摘要

Under ANSI standards, operators of aerial work platforms must perform prestart inspections before use each day or at the beginning of each shift. American Work Platform Training, the North American subsidiary of International Powered Access Federation, has released a 13-minute video that demonstrates how to perform these daily inspections on scissor lifts and boom lifts. Users will see how to inspect operating and emergency controls; safety devices; air, hydraulic and fuel system leaks; loose or missing parts; tires and wheels; placards and warnings; outriggers and stabilizers; guardrail system; and any items specified by the manufacturer.
机译:根据ANSI标准,高空作业平台的操作员必须在每天使用之前或每个班次开始时进行预启动检查。国际工作通道联盟(International Powered Access Federation)在北美的子公司美国工作平台培训(American Work Platform Training)发布了一个长达13分钟的视频,该视频演示了如何在剪叉式升降机和动臂式升降机上进行这些日常检查。用户将看到如何检查操作和紧急控制;安全设备;空气,液压和燃油系统泄漏;零件松动或丢失;轮胎和车轮;标语和警告;支腿和稳定器;护栏系统;以及制造商指定的任何物品。

著录项

  • 来源
    《Professional safety》 |2011年第8期|p.38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号