首页> 外文期刊>Professional mariner >Three new tractors ready for Canadian lng terminal
【24h】

Three new tractors ready for Canadian lng terminal

机译:三台新拖拉机准备用于加拿大LNG码头

获取原文
获取原文并翻译 | 示例
       

摘要

The first LNG regasification plant in Canada is expected to slowly begin operations this summer at Saint John, New Brunswick, while three new ASD tractor tugs have been waiting patiently for the fun to begin.rnIrving Oil partnered with Repsol YPF, S.A. of Spain, one of the world's largest gas concerns, to build this large LNG terminal, situated about 65 miles from the U.S. border. Canaport LNG will connect to the Maritimes & NortheastrnPipeline feeding Sable Island gas to both Canadian and American markets. Initial send-out capacity will be approximately a billion cubic feet of natural gas daily. LNG tankers serving the terminal will require tug escorts through the Bay of Fundy, berthing assistance, and standby and emergency services throughout the unloading operation. The exposed berth and extreme Fundy tides pose some special challenges for tug operations.
机译:加拿大第一家液化天然气再气化厂预计将于今年夏天在新不伦瑞克省圣约翰市缓慢运营,而三台ASD新型拖船已经耐心地等待着乐趣。rnrvingOil与西班牙雷普索尔YPF合作世界上最大的天然气问题,是建造距美国边境约65英里的大型LNG接收站。 Canaport液化天然气将连接到海事和东北管道,为加拿大和美国市场供应黑貂岛天然气。最初的输出能力将约为每天十亿立方英尺的天然气。为码头服务的液化天然气油轮将需要在芬迪湾进行拖船护送,泊位协助以及整个卸载过程中的备用和紧急服务。裸露的泊位和极端的芬迪潮对拖船作业提出了一些特殊的挑战。

著录项

  • 来源
    《Professional mariner》 |2009年第126期|59-61|共3页
  • 作者

    Mac Macay;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:52:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号