首页> 外文期刊>Professional mariner >Salvors push to dismantle Golden Ray before hurricane season
【24h】

Salvors push to dismantle Golden Ray before hurricane season

机译:在飓风季节来临之前,救助者努力拆除金色光芒

获取原文
获取原文并翻译 | 示例
       

摘要

The vehicle carrier Golden Ray, which capsized in September after leaving Georgia's Port of Brunswick, remained submerged on its side in mid-February as salvors finalized plans to break it up for removal. The ship was loaded with about 4,200 vehicles when it rolled over. A unified command (UC) consisting of members of the U.S. Coast Guard, the Georgia Department of Natural Resources, and Gallagher Marine Systems — the company representing vessel owner Hyundai Glovis — opted to cut up the ship after determining that it could not be safely refloated. Plans are in place to erect an environmental protection barrier (EPB) and complete salvage operations before the start of the hurricane season in June.
机译:载具运输船Golden Ray在离开佐治亚州的不伦瑞克港后于9月倾覆,由于救助方案最终敲定了将其拆解的计划,该船在2月中旬仍被淹没。该船翻滚时载有约4,200辆车。由美国海岸警卫队,乔治亚州自然资源部和加拉格尔海洋系统公司(代表船东现代格洛维斯公司组成)的成员组成的统一指挥部(UC)在确定无法安全重新冷冻后选择将其切断。 。已制定计划在6月飓风季节开始之前建立环保屏障(EPB)并完成救助作业。

著录项

  • 来源
    《Professional mariner》 |2020年第244期|12-13|共2页
  • 作者

    Jim Romeo;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:12:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号