The use of performance measurement as a basis for project control of offshore modification oil and gas projects

机译:使用绩效评估作为海上改造油气项目项目控制的基础

获取原文
获取原文并翻译 | 示例
           

摘要

The methods presented in this article are based on the qualitative and quantitative analysis of close-out data drawn from a portfolio of 38 modification projects. The primary premise is that modification projects are intrinsically subject to quantity and complexity growth during the course of detailed engineering as a consequence of the indeterminate interface with the existing facility. The normative project control routines need to be supplemented by material take-offs-based weight monitoring as a basis for re-estimation and re-calibration of the project baselines as detailed engineering proceeds in order to mitigate this uncertainty as early as possible. Similarly, estimating needs to be based on norms drawn from performance measurement of modification work rather than extrapolations from greenfield projects, particularly the work performed on the platforms. This article presents a portfolio of project control methods based on the performance measurement principle covering the short term of single projects as well as the longer term multi-project perspective.View full textDownload full textKeywordsperformance measurement, cost estimating, project control, earned value, cost risk simulation, experience transfer, benchmarking, offshore modifications, oil and gas industryRelated var addthis_config = { ui_cobrand: "Taylor & Francis Online", services_compact: "citeulike,netvibes,twitter,technorati,delicious,linkedin,facebook,stumbleupon,digg,google,more", pubid: "ra-4dff56cd6bb1830b" }; Add to shortlist Link Permalink http://dx.doi.org/10.1080/09537281003661385
机译:本文介绍的方法基于对38个改造项目组合中收尾数据的定性和定量分析。主要前提是,由于与现有设施的不确定接口,在详细工程设计过程中,改造项目本质上会受到数量和复杂性增长的影响。规范的项目控制程序需要辅以基于物料起飞的重量监测作为补充,以作为详细工程进行时项目基线的重新估算和重新校准的基础,以便尽早减轻这种不确定性。同样,估算需要基于对修改工作的绩效评估得出的规范,而不是根据未开发项目(尤其是在平台上执行的工作)进行的推断。本文基于绩效评估原则提出了一系列项目控制方法,涵盖了单个项目的短期以及长期的多项目视角。查看全文下载全文关键字绩效评估,成本估算,项目控制,挣值,成本风险模拟,经验转移,基准测试,离岸改造,石油和天然气行业,more“,pubid:” ra-4dff56cd6bb1830b“};添加到候选列表链接永久链接http://dx.doi.org/10.1080/09537281003661385

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号