首页> 外文期刊>日本建築学会计画論文集 >Study on the planning method of the inner moat of echizen fukui castle study on the town planning method of the castle town, fukui (Part 1)
【24h】

Study on the planning method of the inner moat of echizen fukui castle study on the town planning method of the castle town, fukui (Part 1)

机译:越前福井城堡内护城河的规划方法研究福井城堡城镇的城市规划方法的研究(第1部分)

获取原文
获取原文并翻译 | 示例
       

摘要

This paper aims to identify the planning method of the inner moat of the Japanese castle. Echizen Fukui castle in the age of civil wars, about A.D. 1600. The conclusions are as follows. 1. The planning of the inner moat in the age of civil wars was carried out owing to the precise drawings by the geometrical method. 2. The principal planning methods for the planning were the right angled triangle by pythagoras's number (3:4:5), the magic square and the perpendicular.
机译:本文旨在确定日本城堡内护城河的规划方法。内战时代的越前福井城,约于公元1600年。结论如下。 1.由于采用几何方法绘制的精确图纸,因此在内战时期对内部护城河进行了规划。 2.进行规划的主要规划方法是用毕达哥拉斯数(3:4:5)形成直角三角形,魔方和垂直线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号