首页> 外文期刊>Proceedings of the Institution of Mechanical Engineers >Practical notes on power plant machinery nozzle load and piping
【24h】

Practical notes on power plant machinery nozzle load and piping

机译:电厂机械喷嘴负载和管道的实用说明

获取原文
获取原文并翻译 | 示例
       

摘要

The piping designers always want higher allowable machinery nozzle loads to simplify piping designs, while the rotating machine manufacturers want smaller allowable nozzle loads to assure good alignment, higher reliability and fewer operation complaints. From the power plant operator's point of view, where long-term reliability is a very important factor, the vote should go to the manufacturer. Optimum power piping design, support arrangement and layout configuration for rotating machines of a power plant (turbines, pumps, others) are addressed. Modern practical notes, new guidelines, recent lessons learned and latest achievements on power piping, power machinery nozzle load optimization, stress analysis and piping flexibility review are discussed.
机译:管道设计人员始终希望有更高的允许机械喷嘴载荷以简化管道设计,而旋转机械制造商则希望有较小的允许喷嘴载荷以确保良好的对中,更高的可靠性和更少的运行投诉。从电厂运营商的角度来看,长期可靠性是一个非常重要的因素,应该将表决权交给制造商。解决了电厂旋转机械(涡轮机,泵等)的最佳电力管道设计,支撑布置和布局配置。讨论了现代实用笔记,新指南,最近在动力管道,吸取动力机械喷嘴负载优化,应力分析和管道柔韧性审查方面获得的经验教训和最新成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号