...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Plant life-cycle information management in nuclear new build
【24h】

Plant life-cycle information management in nuclear new build

机译:核电新建工厂的生命周期信息管理

获取原文
获取原文并翻译 | 示例

摘要

This paper considers the challenges to the UK nuclear programme, such as data integration across the project life cycle and a limited skilled workforce, and presents a point of view and strategy for future new build projects. A systems integration approach is suggested to help the industry meet the safety, programme, budgetary and quality needs of this major infrastructure programme. This integrated platform approach, called Plant Lifecycle Information Management (PlantLIM), is designed to manage the transition of data across the design, construction, commissioning, and operation phases of the plant life cycle, thus maintaining data quality and integrity through the life of the plant. Data relate to: (a) process, with robust configuration management to maintain design control through the plant life cycle; (b) technology, with configuration management information systems for a single version of the truth, clear requirements management and traceability; (c) collaboration, where construction control centres are provided for supply chain collaboration; and (d) resource optimisation, comprising technology-based solutions to make best use of a limited workforce. Although the focus is on new build, the approach is equally relevant to plant life extensions and on-site projects.
机译:本文考虑了英国核计划所面临的挑战,例如整个项目生命周期中的数据集成和技能熟练的劳动力,并提出了未来新建项目的观点和策略。建议使用系统集成方法来帮助行业满足此主要基础设施计划的安全,计划,预算和质量需求。这种称为工厂生命周期信息管理(PlantLIM)的集成平台方法旨在管理整个工厂生命周期的设计,构造,调试和操作阶段的数据过渡,从而在整个生命周期内保持数据质量和完整性。厂。数据涉及:(a)具有强大配置管理的过程,以在工厂生命周期内维持设计控制; (b)技术,具有配置管理信息系统的单个版本的真相,清晰的需求管理和可追溯性; (c)协作,其中设有建设控制中心以进行供应链协作; (d)资源优化,包括基于技术的解决方案,以充分利用有限的劳动力。尽管重点放在新建项目上,但该方法与延长设备寿命和现场项目同样相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号