...
首页> 外文期刊>Proceedings of the institution of civil engineers >Lessons learnt from installation of field instrumentation
【24h】

Lessons learnt from installation of field instrumentation

机译:从现场仪表安装中学到的教训

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Imperial College in London, UK, as part of an Engineering and Physical Sciences Research Council (EPSRC) funded research project and in collaboration with Crossrail urban railway project, is performing field monitoring research to investigate how tunnelling affects existing tunnels. Comprehensive instrumentation was installed in Hyde Park and bordering Bayswater Road, beneath which the new Crossrail tunnels were constructed in London Clay below the existing London Underground Central Line tunnels. Surface and subsurface instruments were installed around the Crossrail tunnel alignments to monitor the ground response to the tunnel construction. Monitoring systems of sufficient resolution and accuracy were adopted to achieve high-quality data for assessing the tunnelling-induced ground response and mechanisms of movement from earth-pressure-balance machine tunnelling. The installation of surface and subsurface instrumentation took place in the summer of 2011. This paper describes and discusses the installation of rod extensometers, in-place inclinometers and multi-level vibrating-wire borehole piezometers. Selection of the appropriate cement-bentonite grout mixes for backfilling these borehole instruments is discussed, as this is critical for representative measurements of ground response. Some practical challenges arising during the installation process and how they were overcome are also described. Confidence in the instrument performance is demonstrated using example monitoring results from the piezometer and extensometer installations.
机译:作为工程和物理科学研究委员会(EPSRC)资助的研究项目的一部分,英国伦敦帝国学院正在与Crossrail城市铁路项目合作,正在进行现场监测研究,以研究隧道如何影响现有隧道。在海德公园和贝斯沃特路的边界处安装了综合仪表,在该系统之下,新的Crossrail隧道在现有伦敦地铁地下中央线隧道下方的伦敦粘土区建造。在Crossrail隧道路线周围安装了地面和地下仪器,以监测地面对隧道施工的响应。采用了具有足够分辨率和精度的监控系统来获得高质量的数据,以评估隧道引起的地面响应以及土压平衡机隧道运动的机理。地面和地下仪器的安装于2011年夏天进行。本文描述并讨论了杆式引伸计,就地测斜仪和多级振弦式钻孔测压仪的安装。讨论了用于回填这些钻孔仪器的合适水泥-膨润土灌浆混合物的选择,因为这对于代表性的地面响应测量至关重要。还描述了安装过程中出现的一些实际挑战以及如何克服这些挑战。通过使用压力计和引伸计安装的示例监视结果来证明对仪器性能的信心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号