首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Reconstruction of the Neues Museum in Berlin, Germany
【24h】

Reconstruction of the Neues Museum in Berlin, Germany

机译:德国柏林Neues博物馆的重建

获取原文
获取原文并翻译 | 示例
       

摘要

Construction engineers are increasingly faced with tasks in which a balance must be struck between historic structural designs and modern use requirements. Although they usually master these challenges, a thorough understanding of historic structures and conservation objectives is not widespread. However, such an understanding is key for proper handling of buildings with high conservation significance. In the case of the reconstruction of the Neues Museumin in Berlin, Germany, the most important responsibility of the engineers was to recognise, at an early stage, that purely theoretical approaches would not deliver the intended result and that all parties involved in the project needed to engage in the discussions, which also had to be facilitated. Key services to be provided included the development of verification concepts, planning and designing the required tests in a cross-disciplinary approach and coordinating the activities with the supervising authority.
机译:建筑工程师越来越面临着必须在历史结构设计和现代使用要求之间取得平衡的任务。尽管他们通常掌握了这些挑战,但对历史建筑和保护目标的透彻了解并不广泛。但是,这种理解对于正确处理具有高度保护意义的建筑物至关重要。对于德国柏林的Neues博物馆的重建,工程师的最重要职责是在早期阶段认识到纯粹的理论方法无法达到预期的结果,并且参与该项目的各方都需要参与讨论,也必须促进讨论。所提供的关键服务包括验证概念的开发,以跨学科的方式计划和设计所需的测试以及与监管机构协调活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号