Planning the construction of a deep basement on the site of a previous retained excavation

机译:规划在以前保留的挖掘网站上建造深层地下室

获取原文
获取原文并翻译 | 示例
       

摘要

The ICD Brookfield Place development in Dubai comprises a 290 m tall tower with a seven-level basement (the deepest in Dubai at the time of construction). A five-level basement, with temporary anchored retaining walls along three sides, was previously constructed on the site along with all the foundation piles for the intended structure. The basement was later backfilled when construction ceased in 2009. The previous basement provided considerable constraints to construction of the new basement. Particular challenges included deepening of the basement, the construction of new deeper temporary retaining walls, pile reuse and construction in close proximity to adjacent structures. This paper describes how the constraints were assessed and how a basement construction strategy was developed to overcome them.
机译:迪拜的ICD Brookfield Place开发包括290米高的塔楼,拥有七级地下室(建筑时最深入的地下室)。 具有沿三个侧面的临时固定挡土墙的五层地下室,先前在该场地上以及所有基础桩进行预期结构。 建筑于2009年停止时,地下室后来被回填。以前的地下室为建设新地下室提供了相当大的限制。 特别挑战包括加深地下室,建设新的更深的临时挡土墙,桩重用和靠近相邻结构的施工。 本文介绍了如何评估约束以及如何制定地下室建设策略来克服它们。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号