...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers.Civil engineering >Design and construction of Mumbai Metro Line 3 in India
【24h】

Design and construction of Mumbai Metro Line 3 in India

机译:印度孟买地铁3号线的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

Completion of the US$3.6 billion Mumbai Metro Line 3 in December 2021 will increase the system's capacity five-fold to 1.6 million passengers a day. With 26 underground stations and one depot, the new 33.5 km line will significantly improve connectivity between the northern and southern areas of India's largest city. It is being built directly under temples, residential areas and an airport. Close collaboration with stakeholders contributed to successful delivery and launch of the project's 17 tunnel boring machines. For rail systems, innovative technologies have been adopted to facilitate redundancy and ensure the safety and comfort of passengers.
机译:截至2021年12月的36亿美元孟买地铁3号线3将使系统的容量提高为每天五倍至160万乘客。 新的33.5公里线的地下站和一个仓库,将显着提高印度最大城市北部和南部地区之间的连通性。 它是直接在寺庙,住宅区和机场建造。 与利益相关者的密切合作促成了成功的交付和推出了该项目的17个隧道镗床。 对于铁路系统,已采用创新技术来促进冗余,并确保乘客的安全性和舒适。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号