首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Lessons from transforming a South African special-purpose vehicle into a project implementation agency
【24h】

Lessons from transforming a South African special-purpose vehicle into a project implementation agency

机译:将南非专用车转为项目实施机构的经验教训

获取原文
获取原文并翻译 | 示例
           

摘要

The Trans-Caledon Tunnel Authority was established in 1986 as a special-purpose vehicle to implement the South African side of the binational Lesotho Highlands Water Project. In 2000, it was transformed into a generic public project implementing agency. In this role, it has funded and implemented the timely and economical delivery of large strategic water projects. Its implementation methodologies avoided many of the risks associated with such projects, due largely to the disciplines imposed by its financing model. However, the organisation remains subject to political uncertainties, which means that its project pipeline is dependent on unpredictable mandates, which limits its ability to plan its operations. It nevertheless provides a useful case study of the mobilisation of private finance for public sector infrastructure projects as well as the political challenges inherent in public sector institutional reform.
机译:Trans-Caledon隧道局成立于1986年,是一家专用车,以实施南非北非的北非莱索托高地水项目。 2000年,将其转变为普通公共项目实施机构。在这一作用中,它已经资助并实施了大型战略水项目的及时和经济的交付。其实施方法避免了许多与此类项目相关的风险,这主要是由于其融资模式所施加的学科。但是,该组织仍然受到政治不确定性的影响,这意味着其项目管道依赖于不可预测的任务,这限制了其计划其运营的能力。然而,对公共部门基础设施项目的私营金融动员以及公共部门制度改革中固有的政治挑战提供了一个有用的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号